# Low Project/Task Time Alert

${youtube}[Low Project & Task Hours Alert](HAc05LsbrPY)
---

**Alert type:** Productivity
**Schedule:** Daily/Weekly Notification
**Available on:** Standard and above
**Who can set it up:** Workspace Admin
Where to find it: **Admin Settings › Alerts**

The Low Project/Task Time alert tells which members spent only a short time on projects and tasks. It helps you ask early whether planned work is getting the time it needs, before a quiet day turns into a pattern.
---

### When to use this alert

A low total on projects and tasks has many ordinary explanations: meetings, support work, training, or more. It is rarely the whole story. This alert brings low days to your attention the next morning, so you can ask while the day is still fresh.

**Use it to:**

* Notice low project and task days the next morning, while a conversation is still natural.
* Spot days where meetings or other work may be taking time from planned work.
* Find days where time may not have been recorded against a project or task.
---

### Example alert setup

| Classified Duration is less than equals a Custom value of 04:00, on Monday to Friday.
*In plain English: the alert lists every member whose time on projects and tasks for the day was 4 hours or less, including exactly 4 hours.*


| Field | Value |
| ---- | ---- |
| Alert Schedule | Daily Notification |
| Alert Type | Productivity |
| Alert Name | Low Project/Task Time – Engineering |
| Variable | Classified Duration |
| Condition | less than equals |
| Compare With | Custom |
| By | 04:00 |
| Apply alert on | All Working Days |
| Whom to monitor | Individual members, teams or the entire organization. In this example: the Engineering  team. |
| Who gets notified | Individual, Reporting Manager, All Admin, Custom |
| When to send | Next day, 11:00 am |

**All values in this article are examples.** Times, hours and percentages are sample values to help you get started. Adjust them to your own working hours, roles and policies. They are not benchmarks or recommendations for any industry.
---

### How to set it up

1. Open the alert settings: go to **Admin Settings › Alerts.**
2. Click **"Create New"** button
3. Choose the **Alert Schedule**: Daily Notification.
4. Set the **Alert Type** to Productivity and enter an **Alert Name**, for example "Low Project/Task Time – Engineering".
5. **Set the condition:**
* **Variable:** Classified Duration
* **Condition:** less than equals
* **Compare With:** Custom
* **By:** 04:00
6. Choose **Apply alert on**: All Working Days
7. **Choose whom to monitor:** You can apply the alert to individual members, teams or the entire organisation. In this example, select the Engineering team.
8. Choose **who gets notified**: Individual, Reporting Manager, All Admin, Custom
9. Set **when to send**: Next day at 11:00 am.
10. **Save the alert** and activate it.

![](https://storage.crisp.chat/users/helpdesk/website/-/6/7/1/e/671eefeed0317800/image_1qiljdq.png)


---

### How the rule is evaluated

Time recorded against a project or task counts as project/task time. Time that is not recorded against any project or task is counted separately and does not add to this alert’s value.

Classified Duration is the total time a member spent on projects and tasks during the day. A day spent largely on other work can produce a low value.

Because the condition is less than equals, a member whose project/task time is exactly 04:00 also triggers the alert. Set the value to the level below which you want to ask a question, not the level you expect on a typical day.

A day’s total is complete only after the day ends, so the alert is sent the Next day at 11:00 am. Sending it on the same day would list members whose day is still in progress.

**Worked example**
The table shows five members for one working day.

| Member | Classified Duration | Triggers? |
| ---- | ---- | ---- |
| Priya Sharma | 05:20 | No |
| Karan Malhotra | 04:01 | No |
| Rohan Mehta | 04:00 | Yes (equals the value) |
| Ananya Iyer | 03:15 | Yes |
| Sneha Kulkarni | 01:30 | Yes |

---

### What recipients receive

Recipients get an email that lists the members who met the condition, with a CSV of the details attached. The CSV shows each member’s Classified Duration for the day next to the value set in the alert.

```
Dear User,

Please be informed that the alert "Low Project/Task Time" has been triggered. Currently, 10 out of 38 users have met the following criteria(s):

Classified Duration is less than or equal to custom value of 04:00

For a comprehensive view, please refer to the attached CSV file with detailed information. You can adjust the alert settings here.

We hope this information assists you in identifying trends, making informed adjustments, and supporting a balanced, productive environment for your team.

Best regards,
Flowace Team
```


| Download the sample csv:
| https://de9j6rhbdgsa2.cloudfront.net/sample-reports/Engineering-Team_Low_Project_Task_Time_2026-07-09_common.csv

---

### Choosing recipients and timing

| Field | Recommendation | Why |
| ---- | ---- | ---- |
| Whom to monitor | Reporting Manager, Custom (HR lead); decide deliberately whether to include Individual | A manager can ask a supportive question first. Include Individual if your team already expects to see these alerts. |
| Who gets notified | Individual members, teams or the entire organisation; the example uses one team | Roles differ in how much of the day is spent on projects and tasks, so one value will not suit everyone. Apply an alert to a wider group only when one value fits all of it. |
| When to send | Next day, 11:00 am | The day’s total is final, and managers see it at the start of their day. |

**Use this alert as a prompt for a conversation.** Low Project/Task Time shows a pattern worth checking; it does not explain why it happened. Tell your team which alerts exist and why, send the alert only to the people who need to act on it, and look at the pattern over several days before drawing conclusions.
---

### Reading the results: common scenarios

| What you see | What it may mean | What to do |
| ---- | ---- | ---- |
| One member listed once | A day of meetings, training or other work outside projects and tasks | Usually no action. Note it and watch for a pattern. |
| The same member on several days | Time not being recorded against projects or tasks, unclear priorities, or work outside planned projects | Check in and ask what is getting in the way. |
| Most of a team on one day | A shared cause, such as an all-hands, an outage or a client workshop | Check the cause before speaking to individuals. |
| A value close to 00:00 | Leave, a holiday, or no time recorded. | See whether tracker is running and whether logged hours and active hours are tracked. If tracked, see if users select the projects/tasks while working |

---

### Good to know

* **Teams on different roles need their own alert.** Set a separate alert for each team or role, with its own value.
* **Only recorded time counts.** Members who do not record their time against projects or tasks will show low values, whatever work they did.
* **Full-day values are complete only after the day ends.** The alert uses the day’s total, so it is sent the next day, when the figures are final.
* **Part-day leave lowers the total.** A member who worked half a day can appear, so check leave before drawing conclusions.
* **Alerts follow your workspace settings.** Working days and the time zone configured for your workspace decide when an alert runs.
* **Too many alerts reduce attention.** Start with a few alerts, review how often they fire, and adjust the values.

---

### FAQs

* Why was someone with a short day not listed?
Check that the day is selected under Apply alert on and that the member is within Whom to monitor. Then check the value: 04:01 is above the line and does not trigger.
* Does a member on leave appear?
No, because all working days are configured in this example
* Why does the alert arrive the day after?
It uses the full-day total, which is final only after the day ends. The alert is sent at the Execution Day and Execution time you choose.

---

### Related articles
[How to Set Up Custom Alerts in Flowace](https://help.flowace.ai/en/article/how-to-set-up-custom-alerts-in-flowace-v4qm3m/)


**Need more help?** Reach out to <support@flowace.ai> and our team will be happy to assist.
---
© Flowace Technologies Pvt Ltd | flowace.ai